Skip to product information
1 of 6

Magnum

Magnum Long Lead EDC

Regular price 669,00 Kč
Sale price 669,00 Kč Regular price
Tax included. Shipping calculated at checkout.
Delivery time 3–7 business days

Magnum Long Lead EDC

The Magnum Long Lead EDC is a refined gentleman’s pocket knife for everyday carry, featuring a clean, slightly curved profile and a straightforward slip-joint design prized for its simplicity and reliability. Its satin-finished, flat-ground 440B stainless steel blade opens with a nail nick and is non-locking. Lightly contoured textured G10 handle scales offer a comfortable grip. Supplied with a tip-down, right-side pocket clip.

Highlights

  • 440B blade steel for excellent edge retention
  • G10 handle, durable and ergonomic
  • Slipjoint mechanism for safe, reliable use
  • 8.0 cm blade, versatile for everyday tasks
  • Comfortable carry weight of 78 g

Technical Data

Overall length 18.4 cm
Blade length 8.0 cm
Blade thickness 2.7 mm
Blade steel 440B
Handle material G10
Lock / mechanism Slipjoint
Weight 78 g
Manufacturer Magnum

Scope of Delivery

  • 1x Magnum Long Lead EDC

Product Details

Blade Color

Uncoated

Blade materials

440B

Blade length

8,00 cm

Blade strength

2,70 mm

Handle materials

G10

Opening mechanism

Manual

Opening assistance

Slipjoint

Color

Black

Weight

78,00 g

Total length

18,40 cm

Herstellerinformationen

Verantwortliche Person/Firma in der EU (GPSR): Heinr. Böker Baumwerk GmbH Schützenstr. 30, 42659 Solingen, Germany E-Mail: info@boker.de | Tel.: +49 212 40120 | www.boker.de
Magnum Long Lead EDC

669,00 Kč